|
|
Pine Pienaar wrote: >>I noticed that the new H-stab drawings supplied by Lancair show a "closeout" rib in the elevator where the weights go. The older drawings did not show these. They also increase the total rib count from 3 to 6, can anyone shed some light on these changes.<<
Pine:
Back on 1 April 1999 I raised the question: "The manual suggests an outboard rib at the counterweight station (pp 7-33, 7-34), but the SFB elevator includes no such thing. Is this a remnant of the old stabilizer? " Marv appended an answer to my post, "That outboard rib you mentioned has been deleted in the MKII tail."
As for the increase of total rib count from 3 to 6, are you speaking of the elevator or horizontal stabilizer? If the latter, I did build a short outboard rib where it appears in the drawing, plus the spanwise segment to close the forward face of the counterweight cutout.
My manual revision is A2/04-1-99. If yours is older than this I'd be happy to make a copy of the pages (7-33 and 7-34 in my manual) for you.
Charles Keller, Lancair 360 MKII, #978
---
[This E-mail scanned for viruses by Utahweb]
|
|