|
|
I fabricated a small pressure bulkhead on the aft spar which mated
to a slightly conical sleeve. I then used bulkhead fittings for fuel
and a CPC connector for electrical. By doing it this way you can use
hard line (cheaper, lighter and more reliable than hose) in the wing
fairing and it eliminates the need for the lower access hatch. Mate
the wing and then connect fuel and electrical on the inside of the
cabin. A little RTV on the flange before wing mating seals
everything tight. I was able to pressure test my IV-P to 7.5 PSI
using a 10Hp air compressor. 1,100 hours later, no problems.
Brent Regan


|
|