X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Sender: To: lml@lancaironline.net Date: Fri, 11 Feb 2011 12:42:06 -0500 Message-ID: X-Original-Return-Path: Received: from elasmtp-galgo.atl.sa.earthlink.net ([209.86.89.61] verified) by logan.com (CommuniGate Pro SMTP 5.4c2k) with ESMTP id 4862153 for lml@lancaironline.net; Fri, 11 Feb 2011 11:34:24 -0500 Received-SPF: none receiver=logan.com; client-ip=209.86.89.61; envelope-from=artbertolina@earthlink.net DomainKey-Signature: a=rsa-sha1; q=dns; c=nofws; s=dk20050327; d=earthlink.net; b=OOjGUSmt96+Avfg+qiLIqLEdoYwlNfYxqCaia8kelJBhMVekqEZR9EY6OvrhZUxB; h=Received:Message-ID:From:To:References:Subject:Date:MIME-Version:Content-Type:X-Priority:X-MSMail-Priority:X-Mailer:X-MimeOLE:X-ELNK-Trace:X-Originating-IP; Received: from [12.44.144.252] (helo=LAPTOP2) by elasmtp-galgo.atl.sa.earthlink.net with esmtpa (Exim 4.67) (envelope-from ) id 1PnvwL-0006Ha-4C for lml@lancaironline.net; Fri, 11 Feb 2011 11:33:49 -0500 X-Original-Message-ID: <48A5AA45DC2D4ADD9F9DB99C19542C2E@LAPTOP2> From: "Art Bertolina" X-Original-To: "Lancair Mailing List" References: Subject: Re: [LML] IVP Door Installation X-Original-Date: Fri, 11 Feb 2011 08:33:45 -0800 MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_008B_01CBC9C6.65B8AB60" X-Priority: 3 X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook Express 6.00.2900.5931 X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5994 X-ELNK-Trace: 1c57f4aab304e4a6fc8cc707cfd6285a4d2b10475b571120979bc2ff0d2bad4d8facdde561d63347903e506d148acc71350badd9bab72f9c350badd9bab72f9c X-Originating-IP: 12.44.144.252 This is a multi-part message in MIME format. ------=_NextPart_000_008B_01CBC9C6.65B8AB60 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Tom I went through the builder assist at the factory a number of=20 years ago. As you suggest the top is cleco'ed in place and the door is bonded in, top is then removed again. Art L IV=20 ----- Original Message -----=20 From: Tom & Beth Sullivan=20 To: lml@lancaironline.net=20 Sent: Friday, February 11, 2011 7:37 AM Subject: [LML] IVP Door Installation After a shameful hiatus on my IVPT, I'm finally back on it with some = real passion. I bought the fast build door, and seems like I remember = many builders installing it while the fuselage top was temporarily = fastened (cleco'ed). I will be installing all my windows in the next = week, and would like to install the door after that, if it's efficient = to do before bonding the top on. I looked in the archives, but I can't = seem to find a search filter that doesn't give me 3,000 emails, or = narrows it down too far to about 10. If someone can give me direction = here, I would greatly appreciate it. If it's best to install the door = after bonding the top on, no problem. I'll leave that project until = later. Thanks in advance. Tom Sullivan Fast build kit with slow build builder ------=_NextPart_000_008B_01CBC9C6.65B8AB60 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable
Tom
I went through the builder assist at = the factory a=20 number of
years ago. As you suggest the top is = cleco'ed in=20 place and
the door is bonded in, top is then = removed=20 again.
Art
L IV 
----- Original Message -----
From:=20 Tom = & Beth=20 Sullivan
Sent: Friday, February 11, 2011 = 7:37=20 AM
Subject: [LML] IVP Door=20 Installation

  After a shameful hiatus on my = IVPT, I'm=20 finally back on it with some real passion.  I bought the fast = build door,=20 and seems like I remember many builders installing it while the = fuselage top=20 was temporarily fastened (cleco'ed).  I will be installing all my = windows=20 in the next week, and would like to install the door after that, if=20 it's efficient to do before bonding the top on.  I = looked in=20 the archives, but I can't seem to find a search filter that doesn't = give me=20 3,000 emails, or narrows it down too far to about 10.  If someone = can=20 give me direction here, I would greatly appreciate it.  If it's = best to=20 install the door after bonding the top on, no problem.  I'll = leave that=20 project until later.
 
Thanks in advance.
 
Tom Sullivan
 
Fast build kit with slow build=20 builder
------=_NextPart_000_008B_01CBC9C6.65B8AB60--