X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Sender: To: lml@lancaironline.net Date: Tue, 25 Mar 2008 12:26:23 -0400 Message-ID: X-Original-Return-Path: Received: from mta41.charter.net ([216.33.127.83] verified) by logan.com (CommuniGate Pro SMTP 5.2.1) with ESMTP id 2817282 for lml@lancaironline.net; Tue, 25 Mar 2008 11:57:47 -0400 Received-SPF: pass receiver=logan.com; client-ip=216.33.127.83; envelope-from=troneill@charter.net Received: from aarprv04.charter.net ([10.20.200.74]) by mta41.charter.net (InterMail vM.7.08.03.00 201-2186-126-20070710) with ESMTP id <20080325155700.LLAC2635.mta41.charter.net@aarprv04.charter.net> for ; Tue, 25 Mar 2008 11:57:00 -0400 Received: from axs ([75.132.241.174]) by aarprv04.charter.net with SMTP id <20080325155700.LTKK17353.aarprv04.charter.net@axs> for ; Tue, 25 Mar 2008 11:57:00 -0400 X-Original-Message-ID: <00b001c88e90$dc09e550$6501a8c0@axs> From: "terrence o'neill" X-Original-To: "Lancair Mailing List" References: Subject: Re: [LML] Re: Installing Magnetometer in 360 X-Original-Date: Tue, 25 Mar 2008 10:56:59 -0500 MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_00AD_01C88E66.F3015BA0" X-Priority: 3 X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook Express 6.00.2900.3138 X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.3198 X-Chzlrs: 0 This is a multi-part message in MIME format. ------=_NextPart_000_00AD_01C88E66.F3015BA0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Mine's on the left wedge part of the aft cabin bulkhead, spaced from = other electrical and metal per magnetometer caveats from the hydraulic = pump on the front side of that bulkhead. Seems to work on the = ground.... not flying yet. Terrence ----- Original Message -----=20 From: Tom Gourley=20 To: lml@lancaironline.net=20 Sent: Tuesday, March 25, 2008 09:43 AM Subject: [LML] Re: Installing Magnetometer in 360 Anyone who is or has installed the Grand Rapids EFIS can you tell me = where the best spot to put the Magnetometer is? "Not near any ferrous objects. Jeff" Also stay away from power wiring, strobe power supplies, strobe = wiring, autopilot servos. In the Legacy a fiberglass mounting bracket = bonded to the top of the fuselage just behind the baggage bulkhead works = well. Tom Gourley ------=_NextPart_000_00AD_01C88E66.F3015BA0 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable
Mine's on the left wedge = part of the=20 aft cabin bulkhead, spaced from other electrical and metal per = magnetometer=20 caveats from the hydraulic pump on the front side of that = bulkhead.  Seems=20 to work on the ground.... not flying yet.
Terrence
----- Original Message -----
From:=20 Tom=20 Gourley
Sent: Tuesday, March 25, 2008 = 09:43=20 AM
Subject: [LML] Re: Installing=20 Magnetometer in 360

Anyone who is or has installed the Grand Rapids EFIS can you = tell me=20 where the best spot to put the Magnetometer is?
 
"Not near any ferrous objects.
 
Jeff"
 
 
Also stay away from power wiring, strobe power supplies, strobe=20 wiring, autopilot servos.  In the Legacy a fiberglass=20 mounting bracket bonded to the top of the fuselage just behind = the=20 baggage bulkhead works well.
 
Tom Gourley
 
 
------=_NextPart_000_00AD_01C88E66.F3015BA0--