|
|
Posted for "Colyn Case on earthlink" <colyncase@earthlink.net>:
Not sure I followed why you "broke the bond".
...but it leads me to question something on my airframe.
At annual it was discovered that the very top most stud that attaches the
fuselage to the left side of the gear box was never installed. The current
plan is to drill through the fuselage side, countersink deeply, grind the
side of the screw head to make a V, flox the head into place and cover it over
with flox.
Is there a better way to do this?
Colyn
|
|