I spoke to the Pinpoint guy at Oshkosh. He was very careful selecting
his words when I asked about the Chelton/D2AV situation. He basically told
me that the problem was isolated and corrected, but their product got dropped
from the experimental side of Chelton anyway. He described the
problem as a slow booting circuit in the AHRS, in other words, systems were
booting in the wrong order. Once they found of what was happening
(difficult since it didn't happen very often) it was fairly simple to
correct.
I'm not sure about the timing of the fix with the decision to drop
Pinpoint, but what I've described above may play into this whole thing.
Mike Easley
Colorado Springs
Super ES