Return-Path: Sender: (Marvin Kaye) To: lml@lancaironline.net Date: Sat, 27 Dec 2003 16:43:22 -0500 Message-ID: X-Original-Return-Path: Received: from mail.reflex.co.za ([196.23.156.200] verified) by logan.com (CommuniGate Pro SMTP 4.1.8) with ESMTP id 2907305 for lml@lancaironline.net; Sat, 27 Dec 2003 14:11:17 -0500 Received: from [196.26.210.4] by mail.reflex.co.za [196.23.156.200] with SmartMax MailMax for lml@lancaironline.net; Sat, 27 Dec 2003 21:06:10 +0200 X-Original-Return-Path: X-Original-Message-ID: <003301c3cd11$6dc87e20$04d21ac4@apj> Reply-To: "AP Pienaar" From: "AP Pienaar" X-Original-To: "LancairList" Subject: MKII changes X-Original-Date: Sun, 28 Dec 2003 09:08:37 +0200 MIME-Version: 1.0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: 7bit X-Priority: 3 X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook Express 5.00.2615.200 X-MimeOLE: Produced By Microsoft MimeOLE V5.00.2615.200 Hi I noticed that the new H-stab drawings supplied by Lancair show a "closeout" rib in the elevator where the weights go. The older drawings did not show these. They also increase the total rib count from 3 to 6, can anyone shed some light on these changes. 1) Should anyone upgrade to these changes or not. 2) Can anyone help me with a copy of the older (original) set of MKII manual pages. Kind regards Pine Pienaar pine@cpro.co.za Lancair 360MKII #664