X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Sender: To: lml@lancaironline.net Date: Fri, 11 Feb 2011 10:37:52 -0500 Message-ID: X-Original-Return-Path: Received: from mta11.charter.net ([216.33.127.80] verified) by logan.com (CommuniGate Pro SMTP 5.4c2k) with ESMTP id 4861974 for lml@lancaironline.net; Fri, 11 Feb 2011 09:05:37 -0500 Received-SPF: pass receiver=logan.com; client-ip=216.33.127.80; envelope-from=toms1@chartermi.net Received: from imp10 ([10.20.200.15]) by mta11.charter.net (InterMail vM.7.09.02.04 201-2219-117-106-20090629) with ESMTP id <20110211140501.UKKM6966.mta11.charter.net@imp10> for ; Fri, 11 Feb 2011 09:05:01 -0500 Received: from beth ([24.231.140.52]) by imp10 with smtp.charter.net id 6e501g00L181idC05e51v3; Fri, 11 Feb 2011 09:05:01 -0500 X-Authority-Analysis: v=1.0 c=1 a=coiafW6BlV-Mk2598X0A:9 a=uPCUExesTp9_k91TgBV-aCAqqhAA:4 a=wPNLvfGTeEIA:10 a=u3NBb192RbAf9OYpI2oA:9 a=8t4N431zPBfr62dQwwIA:7 a=KnCnMOIldTTtIbVMHfEMVPQC6csA:4 X-Original-Message-ID: <42B8154FC4C846DDBCDB281448B081A3@beth> From: "Tom & Beth Sullivan" X-Original-To: Subject: IVP Door Installation X-Original-Date: Fri, 11 Feb 2011 08:04:59 -0600 MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_0045_01CBC9C2.612193E0" X-Priority: 3 X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook Express 6.00.2900.5931 X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5994 This is a multi-part message in MIME format. ------=_NextPart_000_0045_01CBC9C2.612193E0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable After a shameful hiatus on my IVPT, I'm finally back on it with some = real passion. I bought the fast build door, and seems like I remember = many builders installing it while the fuselage top was temporarily = fastened (cleco'ed). I will be installing all my windows in the next = week, and would like to install the door after that, if it's efficient = to do before bonding the top on. I looked in the archives, but I can't = seem to find a search filter that doesn't give me 3,000 emails, or = narrows it down too far to about 10. If someone can give me direction = here, I would greatly appreciate it. If it's best to install the door = after bonding the top on, no problem. I'll leave that project until = later. Thanks in advance. Tom Sullivan Fast build kit with slow build builder ------=_NextPart_000_0045_01CBC9C2.612193E0 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable
  After a shameful hiatus on my = IVPT, I'm=20 finally back on it with some real passion.  I bought the fast build = door,=20 and seems like I remember many builders installing it while the fuselage = top was=20 temporarily fastened (cleco'ed).  I will be installing all my = windows in=20 the next week, and would like to install the door after that, if=20 it's efficient to do before bonding the top on.  I looked = in the=20 archives, but I can't seem to find a search filter that doesn't give me = 3,000=20 emails, or narrows it down too far to about 10.  If someone can = give me=20 direction here, I would greatly appreciate it.  If it's best to = install the=20 door after bonding the top on, no problem.  I'll leave that project = until=20 later.
 
Thanks in advance.
 
Tom Sullivan
 
Fast build kit with slow build=20 builder
------=_NextPart_000_0045_01CBC9C2.612193E0--