|
|
Looks really good Jerry.
Steve Brooks
--- Jerry Hey <jerryhey@earthlink.net> wrote:
The fuel rail is finished. It turned out pretty
nice, I think. It is held to the plenum with four ss bolts threaded into
bosses on the side if the plenum. Ed Klepeis did the aluminum
welding on the rail which turned out beautiful like all of his work. I have decided to make the top of the plenum removable but it too damn
hot in the shop (aka the sauna) to do that today. The intake is
about done except for the throttle linkages. Beer time. Jerry
BTW, I had a reamer made for the injector bosses. It is .5430 inches. If any one wants precision sizing on this part, I
will be glad to do it for you, no charge.
> > >> Homepage: http://www.flyrotary.com/
>> Archive: http://lancaironline.net/lists/flyrotary/List.html
|
|