Mailing List flyrotary@lancaironline.net Message #25241
From: Jerry Hey <jerryhey@earthlink.net>
Subject: P port intake
Date: Thu, 21 Jul 2005 14:03:56 -0500
To: Fly Rotary aircraft <flyrotary@lancaironline.net>
The fuel rail is finished. It turned out pretty nice, I think. It is held to the plenum with four ss bolts threaded into bosses on the side if the plenum.      Ed Klepeis did the aluminum welding on the rail which turned out beautiful like all of his work.    I have decided to make the top of the plenum removable but it too damn hot in the  shop (aka the sauna) to do that today.  The intake is about done except for the throttle linkages.  Beer time.           Jerry

BTW,  I had a reamer made for the injector bosses.  It is .5430 inches.  If any one wants precision sizing on this part, I will be glad to do it for  you, no charge.

Image
fuel rail 3.jpg

Subscribe (FEED) Subscribe (DIGEST) Subscribe (INDEX) Unsubscribe Mail to Listmaster