Mailing List lml@lancaironline.net Message #54434
From: paul miller <paul@tbm700.com>
Sender: <marv@lancaironline.net>
Subject: Re: [LML] Re: AIrcraft video
Date: Tue, 09 Feb 2010 20:39:42 -0500
To: <lml@lancaironline.net>
Nothing special but I did use the tie-down points in the wing.  Using the tiedown ring which screws into the wing and tail and a piece of rubber to protect the wing.  I also put a carriage screw through the base the camera comes with and tie-wrapped the entire assembly just in case any of the plastic pieces let loose.  The assembly shown screws into the bottom of the wing (tie wraps not shown).  I ran it to 220K in that video.


On 2010-02-08, at 3:10 PM, Colyn Case at earthlink wrote:

> Paul, looks great.  how about some pics of how you attached it to the plane?
Image
vholdr 008.jpg
Image
vholdr 009.jpg
Subscribe (FEED) Subscribe (DIGEST) Subscribe (INDEX) Unsubscribe Mail to Listmaster