Current Project State - well beyond fast-build stage:
Fuselage on gear – top fuselage half fitted
Wings completed and closed
All flying surfaces completed and closed (except vertical stab)
All windows installed (except windshield)
Controls and Rudder pedals installed
Instrument Panel and control column fitted
Cabin door and baggage door installed
All interior panels are fabricated, fitted and primed
Speed brakes and strobe lighting included
Truly excellent workmanship on the completed assembly
Remaining tasks
Bond in horizontal stabilizer
Complete vertical stabilizer, bond fuselage halves
Install fuel & hydraulic lines
Purchase and install avionics
Purchase and install firewall forward
Fit Engine Cowl
Purchase and install
interior
Paint
Project located in Sacramento, CA
Project can be transported in 24' moving truck (seller can help with transport)
Asking $85K / offer
todd.winkler@yahoo.com
650-303-3303