Mailing List lml@lancaironline.net Message #43024
From: Zavatson, Christopher J (US SSA) <Christopher.Zavatson@baesystems.com>
Sender: <marv@lancaironline.net>
Subject: RE: [LML] Initial Hydralic Priming
Date: Wed, 11 Jul 2007 06:07:29 -0400
To: <lml@lancaironline.net>
Tom,
-no special procedure required.  
Fill the reservoir, run the pump a few seconds in one direction, then a
few seconds in the other.  Top off the reservoir and repeat.  After a
few iterations you will have filled all the lines and cylinders and the
system will come up to pressure.  
The only caution is to never let the pump run dry, even for an instant.
Watch the fluid level while initially cycling the pump.
Chris


Chris Zavatson
N91CZ
360std
www.N91CZ.com

Subscribe (FEED) Subscribe (DIGEST) Subscribe (INDEX) Unsubscribe Mail to Listmaster