The manual calls for the header tank to be bonded to
the forward deck before attaching the forward deck. Whereas this makes
sense when using the non-removable attachment method, it seems it would be
easier to install the hinges before bonding the header tank when using the
hinge attachment method. Did anybody install the attachment hardware
before attaching the header tank? Any pitfalls or words of
wisdom?
Gary,
I did indeed install the forward deck attachment hinges before bonding
in the header tank. With clecoes holding the deck skin in place, a frame
was bondoed to the skin, much like the canopy construction method, to hold the
shape of the deck skin while the hinges were built. The tank was
trimmed, new flanges built on the tank, and finally, the tank was bonded and glassed
to the deck skin. The frame was knocked off and work proceeded with the
canopy alignment, etc.
Scott