John and Ron,
<SNIP>
--- John Schroeder <jschroeder@perigee.net> wrote:
>We have
> closed out the
> H-S, but your remark in this posting about the 3 BID layup in the aft
> spar-to-skins channel made us stop and think. We are not sure if it
> is required.
> The hinge brackets were already installed and marked as torqued with
> lacquer.
<SNIP>
Humm, Just last week, Carsten told me that the 3 BID was not required
if you have the C-channel aft spar. He also said that the 2 BID is
required on the inboard elevator ribs where the actuator arm attaches.
<SNIP>
> We also found that the top spacer on the hinge weldment prevented the
> full up
> travel. It hit the hinge bracket so we had to file that one down.
> Looks like that
> may be a recurring problem for anyone, especially if the hinges are
> already
> installed.
<SNIP>
My hinges were already installed and torque sealed as well, but I have
not checked the travel as yet. I will post my findings when I get
there.
I did, however have problems with the alignment of the actuator arm on
the elevator inboard ribs. The thing did not line up with the ribs. I
have sent an e-mail with photos to Carsten. I expect an answer on
Monday. You can see photos of the problem at:
http://y42.photos.yahoo.com/bc/mylnce/lst?.dir=/Elevator+Problems&.view=t
Mike Salzman
LNCE (FB) N811ES 25%
Fairfield, CA
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
LML website: http://www.olsusa.com/mkaye/maillist.html
LML Builders' Bookstore: http://www.buildersbooks.com/lancair
Please send your photos and drawings to marvkaye@olsusa.com.
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
|
|