Doug, Tracy can best respond, but from what I saw
the engine compartment looked done. There was still some electrical wiring to
do and I believe the ailerons and aileron control rods still remained to be
installed. I’m sure that the 90% complete is similar to many – only 90% left
to do. That’s the trouble when you are 90% complete, folks come by several
months later and comment “must’a not been working on it – looks the same as
last time {:>)” Right Tracy????
Ed
From: Rotary motors in aircraft [mailto:flyrotary@lancaironline.net]
On Behalf Of DLOMHEIM@aol.com
Sent: Sunday, October 26, 2008
3:29 PM
To: Rotary
motors in aircraft
Subject: [FlyRotary] Rotary Round
Up Final Question...
I checked out some of the pictures posted
from this years "round up" (thanks for that) and it appears from
them that Tracy's RV-8 has made quite a bit of progress since last year (when I
attended the round up).
So a question to those of you who saw it
up close and personal...what does it still lack prior to knocking out a
first flight?
Cowling? Final Electrical hook
ups?
RV-9A; 13B / Finishing and FWF
Play
online games for FREE at Games.com! All of your favorites, no registration
required and great graphics – check
it out!
__________ Information from ESET NOD32 Antivirus, version of virus signature
database 3267 (20080714) __________
The message was checked by ESET NOD32 Antivirus.
http://www.eset.com