X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Sender: To: lml@lancaironline.net Date: Sun, 04 Oct 2009 05:07:08 -0400 Message-ID: X-Original-Return-Path: Received: from vms173015pub.verizon.net ([206.46.173.15] verified) by logan.com (CommuniGate Pro SMTP 5.2.16) with ESMTP id 3873634 for lml@lancaironline.net; Sat, 03 Oct 2009 21:47:34 -0400 Received-SPF: pass receiver=logan.com; client-ip=206.46.173.15; envelope-from=n5zq@verizon.net Received: from newness ([173.72.129.117]) by vms173015.mailsrvcs.net (Sun Java(tm) System Messaging Server 6.3-7.04 (built Sep 26 2008; 32bit)) with ESMTPA id <0KQY00LBJVLDAI82@vms173015.mailsrvcs.net> for lml@lancaironline.net; Sat, 03 Oct 2009 20:46:25 -0500 (CDT) X-Original-Message-id: <3F1C7AA134464045808542CC7B3127F9@newness> From: "Bill" X-Original-To: "Lancair Mailing List" References: Subject: Re: [LML] LNC2 Fuel Slosh Door Position X-Original-Date: Sat, 03 Oct 2009 21:46:32 -0400 MIME-version: 1.0 Content-type: multipart/alternative; boundary="----=_NextPart_000_0028_01CA4472.F8AC91A0" X-Priority: 3 X-MSMail-priority: Normal X-Mailer: Microsoft Outlook Express 6.00.2900.5843 X-MIMEOLE: Produced By Microsoft MimeOLE V6.00.2900.5579 This is a multi-part message in MIME format. ------=_NextPart_000_0028_01CA4472.F8AC91A0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Will, An LNC2 don't need no stinkin' slosh doors (assuming that you're = building according to plan with a header tank). :-) Bill Harrelson N5ZQ 320 1,700 hrs N6ZQ IV under construction I have my ribs cut out and rough fitted into the wing. The plans I = got from Lancair do not specifiy where on the rib the slosh doors should = go relative to the chord. My question is how far back from the spar = should the centers of the doors be? What have you guys done? Will ------=_NextPart_000_0028_01CA4472.F8AC91A0 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable
Will,
 
An LNC2 don't need no stinkin' slosh = doors=20 (assuming that you're building according to plan with a header = tank). =20  :-)
 
Bill Harrelson
N5ZQ 320 1,700 hrs
N6ZQ  IV under = construction
 
 
 

I have my ribs cut out and rough = fitted into the=20 wing.  The plans I got from Lancair do not specifiy where on the = rib the=20 slosh doors should go relative to the chord.  My question is how = far back=20 from the spar should the centers of the doors be?  What have you = guys=20 done?
 
Will

------=_NextPart_000_0028_01CA4472.F8AC91A0--