|
Posted more pictures in albums 2,3,4,5 at:
http://w1.lancair.net/pix/jschroeder.
Fitting and installation of engine baffling, aileron rigging, cowling fasteners.
Interior is 50%, fuel tank calibration is next, then EFIS calibrations, then the punchlist and inspections.
Cheers,
John Schroeder
Getting mighty close.
--
|
|