I used the DAR to get the paperwork. He did a 1 hour "look
over".
But I relied on Orin to do the really thorough inspection before he put his
butt on the line on the first flight.
I also had two A&Ps look over the engine installation and a couple
other Lancair builders look things over throughout the build.
Mike Easley
ES