Pine -
The manual states to use 3-BID at the rib-fuselage junctures. This point is
not clearly stated, I'll admit, but it does say 3-BID. The illustration is
rather vague since it doesn't show that upper area you're referring to. You
should not add these until after you add the 12-BID load transfer pad. (Or if
you do, don't put the 3-BID where the 12 BID will go later)
Marv is correct -- a generous micro fillet is required. I found the layup to
be quite easy when the aircraft is upside down.
By the way, a goodly fraction of the LC20 wheel wells I've examined at Oshkosh
-- maybe a third of them -- have forgotten to include the 3-BID layup.
- Rob Wolf
rwolf99@aol.com
|
|