|
I've designed in quite a bit of electrical dependancy, so the
alternator-out running time has me concerned. With all injectors and
coils on seperate switches, it should be possible to extend the range by
switching off a set of injectors and the trailing coils, and accepting
reduced power. Does that sound viable?
-------------
I guess you meant "electrical redundancy".
On my 20B install, a 15A fuse blew running 3 LS1 coils. 20A seems to be OK.
Does pulsing two injectors take more current than pulsing one injector twice
as long?
Al
|
|