Hi Guys,
In my experience, a water level is more
than adequate for any construction job.
The problem with implementation is that
the water volume and the tubing volume
is in a constant state of flux.
This changes the height of the water column at both
ends. Temperature changes,
even small ones, will change the size of the tubing and
the volume of the water.
When checking for level, both ends have to
be verified at the same time.
--Sandy