X-Virus-Scanned: clean according to Sophos on Logan.com Return-Path: Received: from pop-savannah.atl.sa.earthlink.net ([207.69.195.69] verified) by logan.com (CommuniGate Pro SMTP 5.1c.3) with ESMTP id 1354621 for flyrotary@lancaironline.net; Tue, 29 Aug 2006 12:27:27 -0400 Received-SPF: none receiver=logan.com; client-ip=207.69.195.69; envelope-from=mldsub@earthlink.net Received: from fl-69-69-141-15.dyn.embarqhsd.net ([69.69.141.15] helo=pss6ea5f1dbeb5) by pop-savannah.atl.sa.earthlink.net with esmtp (Exim 3.36 #1) id 1GI6QA-0000Xo-00 for flyrotary@lancaironline.net; Tue, 29 Aug 2006 12:26:41 -0400 From: "Sandy" To: "'Rotary motors in aircraft'" Subject: RE: [FlyRotary] Re: OT: Gardenhose as level Date: Tue, 29 Aug 2006 12:26:19 -0400 Message-ID: <021b01c6cb87$e9933500$6401a8c0@pss6ea5f1dbeb5> MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_021C_01C6CB66.62840600" X-Priority: 3 (Normal) X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook, Build 10.0.2627 In-reply-to: X-MIMEOLE: Produced By Microsoft MimeOLE V6.00.2900.2962 Importance: Normal This is a multi-part message in MIME format. ------=_NextPart_000_021C_01C6CB66.62840600 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Hi Guys, In my experience, a water level is more than adequate for any construction job. The problem with implementation is that the water volume and the tubing volume is in a constant state of flux. This changes the height of the water column at both ends. Temperature changes, even small ones, will change the size of the tubing and the volume of the water. When checking for level, both ends have to be verified at the same time. --Sandy ------=_NextPart_000_021C_01C6CB66.62840600 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Hi = Guys,

In my experience, a water level is = more than adequate for any construction job.

The problem with implementation is = that the water volume and the tubing volume

is<= /span> in a constant state of flux.  This changes the height of the water column at = both

ends.  Temperature = changes, even small ones, will change the size of the tubing = and

the= volume of the water.

When checking for level, both ends = have to be verified at the same time.

--Sandy

 

 

 

 

------=_NextPart_000_021C_01C6CB66.62840600--